HUAWEI BTS COMMISSIONING PDF

1. Application Description 1) Service Description The base station commissioning indicates that the users commission and verify the base. OptiX RTN Radio Transmission System. VRC Commissioning and Configuration Guide (Web LCT). Issue, Date, HUAWEI. Huawei DBS Commissioning Procedure Security Level: Huawei DBS Commissioning Procedure (V) HUAWEI Confidential Page1.

Author: Gardar Mezidal
Country: Timor Leste
Language: English (Spanish)
Genre: History
Published (Last): 2 May 2013
Pages: 133
PDF File Size: 5.55 Mb
ePub File Size: 7.36 Mb
ISBN: 406-1-83473-519-3
Downloads: 84345
Price: Free* [*Free Regsitration Required]
Uploader: Shakadal

It will take about 10 minutes to activate the software. Group Post User Document. And then you can get the values in this Commissionimg file. This report then provides the basis for scheduling activities for commissioning preparation and commissioning activities.

Micro Base Station Commissioning Guide-Wireless Network Info Community-Huawei Connect

Different base stations use different commissioning tools. Scope The scope of this document is to give a detail procedure for the commissioning of the Huaweei DBS base station. Click Add and Fill the table. The following section describes the checks required.

Log In Sign Up. Site Awareness There are a number of site in Canada that are in remote location that require situational awareness therefore when travelling to and from remote site locations it is important that the engineer is equipped for travel to remote sites Engineers must also be aware commissooning Tower work takes precedent over any other hiawei work; therefore if tower work is in progress then the tower crew is in control of the site.

  EMB PUMPEN PDF

Then double-click Software Update. If tower work is in progress then hard hats are required to be worn onsite. To learn more about dommissioning commissioning scenarios and base station to be commissioned, refer to the corresponding chapters in the commissioning guide. Enter the email address you signed up with and we’ll email you a reset link.

Fixed Network Info Community Members: Wireless Network Info Community Members: Application Description 1 Service Description The base station commissioning indicates that the users commission and verify the base station based on design requirements to ensure that the base station can work properly.

The commissioning procedures for different base stations all include the following aspects: If it is not the right version, please do Item 10 Local Commissioning again. Input the User Name: The base station commixsioning be deployed has been configured. From this report a forecasting schedule will then be produced to initiate the site configuration data to be prepared and the scheduling of engineers to attend site for commissioning.

To finalize the commissioning of the NodeB and make it ready for call commissionign it is necessary to notify the RNC engineer that the software upgrade and the commissioning is complete. Before commissioning a base station, ensure that the following prerequisites are met: The diagram below details the orientation of the Antennas, the first sector Alpha commissloning the one orientating to the north east, alone the clockwise, are the second Beta and the third Gamma sector.

For different base station commissioning scenarios, the following methods can be used: Skip to main content. Please refer to the document: Once the NodeB has reset the new configuration will take effect.

  CATALOGO DE PISOS Y AZULEJOS VITROMEX PDF

If required the engineer may have to remain off site until tower crews have finished any ongoing operations. You need set IP Address is The following methods can be used for quick commissioning: Core Network Info Community Members: After the reset is complete, DBS runs normally, the status should now be: Check the download speed 4.

Make sure the PSC is right in each cell. The full reset will take about 5 minutes. Click here to sign up.

RTN 950 V100R003C01 Commissioning and Configuration Guide 02(Web LCT)

To do this the engineer will need to us a compass to find orientate the direction of the sectors and then verify the Cell ID and scrambling codes for each antenna. Testing will differ slightly between S and S sites due to the different in cells present on the site.

Once you are logged in successfully you should see the following. If the some of the commands failed, please call RNC Engineer for troubleshooting.

The RNC engineer will need to unlock the cells and load the appropriate license keys for the NodeB configuration.